The first thing I did on the super structure was to install a temporary floor in the wheel house to bring things close to the finish floor level. After I had the wheel house floor back up to grade I installed all of the cleats and tabs I need to bolt the lumber to. Trying to use up what material I have on hand, I cut my longer pieces of flat bars in to tabs, and wherever possible, used the tabs welded in place to bolt lumber to. Once I have the interior painted, Ill bolt lumber to the tabs and cleats, then have the insulator spray foam the interior of the super structure.
Im limited to the wall thickness around the windows to 2.25" due to using the clamp rings. The clamp rings will make for a nice neat finish, but I wish I would have been able to get the rings for a 3.5" wall thickness. Im able to make the wall thickness on the front of the wheel house 2.25", but the rest of the boat is going to be thicker due to the framing, so Ill have to build some custom wood trim rings to tie everything together.
I like the way the exhaust funnel looks and in order to keep things looking good I had the metal formed on a press brake. The fab shop owners is one of my neighbors and it was fun helping him do this small job for me. The exhaust funnel is tapered so there are two different radiuss on the piece. In order to get the different radiuss Mark set the machine to hit harder on one side than it did on the other. His machine is a Cincinnati 300 ton press brake, and was built in 1942. Cincinnati is a good brand, and this machine was built in a era in this country that has faded fast. We need our manufacturing jobs. Mark laid the pieces out for 20 hits per piece, and in this picture, you can see him lining the die up to hit on his punch marks. I welded a four inch stainless pipe in to the exhaust funnel. Im thinking about running the exhaust stack up the mast, and if I do that, Ill probably either do that in chrome or stainless. If I dont run it up the mast, Ill clamp a stainless or chrome 45 on the the nipple and call it done. I have room for a silencer on the exhaust piping, but for right now, Im not going to install one. If I run the exhaust pipe up the mast, the outlet will be so high and with the wind blowing the sound away from the boat, I doubt youll hear it. You might hear the whistle from the turbo, but I think that sounds good. I can always add a silencer if I need to, I just would rather not as they get hot and its just one more thing to buy and maintain.
The inside of the exhaust side of the funnel will be insulated to help keep the heat headed up and out. Ill post more on this later down the road, but Ill be using some fans in the engine room to help air get in and force warm air out.
I also will need a cradle for our yet to be designed skiff ( Kevin M), so instead of figuring out a cradle for a skiff I dont own yet, I just welded some 12" long x 3" wide doubler plates where I plan on building the skiff cradle.
The last roof job I need to complete is welding the tabernacle for the mast along with the pad eyes for the mast fore stay and shrouds, and brackets for flopper stopper poles. Flopper stopper poles are poles that extend away from the boat when at anchor and allow you to hang a device that helps mitigate rolling of the boat. I accepted some advice from an engineer I know and am reinforcing all of these parts to be robust enough to accept a more demanding paravane system to help with rolling while were under way. Because Im building a lot of these parts out of 1/2" stainless, I had to develop a cut list and have a local shop cut all the parts for me on a band saw. I just got all the parts back from the shop the other day, and Ill start putting it all together this week.
By the end of the week, Ill be able to move the welder off of the roof and finish a few simpler jobs on the aft wall of the salon. Primarily, the fill and vent points for the fuel tanks, the outdoor shower brackets, cutting the starboard side of the salon so the boarding door works, and a few other smaller brackets. I feel pretty good that Ill be prepping for paint in a week or ten days, and should be done painting by mid September.. I might sneak away from work a few days to make sure I can get all this done, but early October looks to be about when Ill be moving her out.
.jpg)
.jpg)
Im a little blown away with how long it took to get the metal work completed. I did have a major set back in that the rough openings for the windows were cut for a four inch radius, and the windows are built using a six inch radius. There are 17 windows in the super structure and the repair consisted of me using my plasma cutter to cut out the 68 corners out of the existing rough openings. I then cut 68 new radius corners and welded them back in to the openings. The windows in the salon were easy as they were all square. The windows in the pilot house were a bit more of a challenges as they are all parallelograms, and required a little bit of noggin work to get the angles along with the radiuss correct. But, the window openings are now correct and all the widows fit the way theyre supposed to. Along with repairing the window openings, I added 60 or 70 more tabs to the window openings to bolt framing lumber to.
We have a shower for the cabins below deck, but due to the size of my posse, I felt it best if we had another shower on board. The easiest place to do this was on the aft deck in the port side corner of deck on the salon bulkhead. This will be a hot/cold shower. I fabricated a stainless shelf with a lip on it to retain soap, and a bar for wash rags and to hold back shampoo bottles.
On the aft salon bulkhead on the aft deck the fuel fills and vents reside. There is a two inch fill on both the port and starboard side. Next to each fill are the vents for the two port side tanks and two starboard tanks. The fill and vent pipes are welded in place. I really need a box around each set of pipes, similar to what Peter did on Koala ( now Kame Hele... not sure of the spelling). I have a little bit of time left where I can fabricated these boxs, and I might try braking them over the work bench. If not, my neighbor will do it on his press brake.
I welded the six inch vent intakes for the master cabin. These vents are in the foreword wall of the wheel house.
I was going to get fancy and use a torsion spring to have the ladder self stow up on the roof, but my short time frame killed that idea and I decide to stow the ladder on stainless post welded to the front of the wheel house. The forward rake of the wheel house windows along with the almost 5 distance to the Portuguese bridge will allow all to pass by this area without bumping the ladder. It will make more sense once the super structure is welded to the hull. 


