The electrical panel in the wheel house is fully functioning, but still needs some work from the engine room to call it a wrap. I have the 80 amp three battery bank charger installed and connected to the house battery bank, but since the engine and generator batteries are not installed, those two connections need to be made. Ive decided upon a location for the battery switchs so Im able to move forward with fabricating the starter cables along with fabricating the battery switch panel. Because Im sort of bouncing between the engine room and the wheel house before going full tilt boogie in the salon, I need to get the battery box built in the engine room. I keep having moments where I a tool could be laid across the battery posts or something metal like a square could fall and land on the posts, so I need to get the box finished to protect the batteries. Having the DC system fully functioning is one more item I want off the list before I can begin sheathing the salon.
.jpg)
The salon is a fairly straight forward sheathing job as all of the time consuming wood working details have already been dealt with. The exhaust stack is covered. The up and down bound stairs are sheathed and trimmed. The fridge and microwave nook are installed. Given that the tricky stuff is finished, Im going to go out on a limb and say Ill have the room sheathed by the end of April. A lofty goal, but one that needs to be attained.
Cheers
0 komentar:
Posting Komentar