Passage door update 2






All five passage doors are hung in their openings and have two coats of urethane finish on them. Another fairly large job can be, for the most part, checked off of the list.

Because of having to build the boat in two sections ( hull/ wheel house @ salon), I cannot install the ceiling in the hallway and master cabin. Because I cannot finish the ceilings, there is no point in casing the doors, so that job will wait until the boat gets to the launch site.

I purchased a mortise lock set for the master cabin bathroom door. The lock set is solid brass with a brushed nickel finish so my hope is the lock set will handle corrosion. I installed the lock set and Im happy with how it looks and works. Installing a mortise lock set is a slow, time consuming job with very little room for error. I roughed in the mortise with a 5/8 forstner bit, then cleaned out the mortise with a chisel. I had to make a jig to hold the door plumb with my drill press, and other than cutting the mortise a 1/4" shallow, all went well. From start to finish, I had about 2 1/2 hours in installing the lock set with 1/2 of an hour consumed with building the jig for the drill press. The lock set has a dead bolt so we can lock the door from inside of our cabin. I think Ill have dead bolts on our cabin doors, and the bathroom doors, but will use lock sets without dead bolts for the other doors.

I brushed two coats of gloss urethane finish on the doors. Im not incredibly happy with the finish and I think Ill spray the final coat of finish on the doors. No matter how hard I try, I just cant seem to brush a good finish on my work. I think my problem is Im expecting too much out of two coats of finish. Next summer, when the boat is at the launch site and were putting the final finish coats on everything, Im hoping Ill get some help on getting a decent top coat on all the wood. For right now, everything is getting two coats for protection, and thats the story Im sticking with.

The next job is to get the bathroom completed. There is really not a huge amount of work left to finish that room, and I should be able to get it off of my list in a week or so. I have to install the exhaust fan, install the ceiling, fabricate the interior trim ring for the portlight, and install the portlight.