I should probably start by saying Im going to stop crying about the winter that wont end. I know its close to giving up the beast, but after the 6" storm we had two days ago, and lows in the single digit this week, its fighting to the bitter end. The high today was around 26 degree F, but with the sun gathering strength, the cold air temperature can no longer sustain the snow, and its quickly receding. Given the air temperature is still below freezing cold, having the boat facing south, along with the strengthening sun, heats the inside of the boat up quickly, and I really dont have to run the heater at all.
I finished trimming the windows, and also got some color on the wood. The window trim is basically a house style detail being a 1/2" x 2 3/4" casing, a 3/4" x 2 1/4" stool, and a 1/2" x 2 3/4" bonnet under the stool. All the reveals are a 1/4". Its a simple look, but I think its legitimate..jpg)
Some more progress has been made in the wheel house, and Im inching up on getting the wood work completed. The layout was finalized, and more compromises were made. We were pretty dead set on having a 240 volt clothes drying machine and a 120 volt clothes washer, but in the end, having two units just took up too much space. In the space where the clothes dryer was going to go, I built a base cabinet with two large drawers, and two doors underneath. Because the drawers are so wide, I used 3/8 plywood for the bottoms vs the usual 1/4". Im planning on the drawers being used for paper charts and other things navigation. The drawer fronts are not installed yet as I just fitted the boxes in place.
.jpg)
Just aft of the new base cabinet is the opening for the compact LG washer/dryer combo unit. Out of all the units I looked at on line, the LG units have the best, most consistent reviews. Im a little leery of its ability to dry clothes with only 120 volts, so I have it in the back of my head that a decent working clothes line might be in order... probably something on the roof running off of the mast.
The large opening starboard of the instrument dash area is where the electrical distribution panel is going to go. I had some sort of cut twice/measure once thing going on and screwed up the door that houses the electric panel. I found out this mistake today as I was fitting all the shiny parts Ive made in the last week.
I have the wheel house counter top fabricated and dry fitted in place, but not not yet installed. Before the top gets installed, I need to land all the wires on the bulkhead behind the distribution panel door. I used THHN for the primary wiring behind the walls, and will land all that on terminal strips. From the terminal strips, to the distribution panel, Im using a flexible, tinned, marine wire. I have about 90% of the boat wire pulled to the area under the dash, and landing it with the top off is going to be huge vs lying on my back. I realize Ill still be doing some wiring while laying down, but I want to get as much done while its relatively accessible..jpg)
While I was fabricating in the barn last week, I decided to make the panel that finishes covering the dry exhaust/intake stack. Because the stack is such a large fixture, I decided to make this panel a raised panel. A large, flat piece of plywood just didnt feel right. The cherry veneer plywood is for sure nice material, but in my opinion, is a little too perfect. The air dried cherry I am using oozes character, and really puts the plywood to shame in regard to interest. Being in the center of the room and such a visual element, this large raised panel looks spot on.
Heres to the coming Spring.
Cheers
Read More..
I finished trimming the windows, and also got some color on the wood. The window trim is basically a house style detail being a 1/2" x 2 3/4" casing, a 3/4" x 2 1/4" stool, and a 1/2" x 2 3/4" bonnet under the stool. All the reveals are a 1/4". Its a simple look, but I think its legitimate.
.jpg)
Some more progress has been made in the wheel house, and Im inching up on getting the wood work completed. The layout was finalized, and more compromises were made. We were pretty dead set on having a 240 volt clothes drying machine and a 120 volt clothes washer, but in the end, having two units just took up too much space. In the space where the clothes dryer was going to go, I built a base cabinet with two large drawers, and two doors underneath. Because the drawers are so wide, I used 3/8 plywood for the bottoms vs the usual 1/4". Im planning on the drawers being used for paper charts and other things navigation. The drawer fronts are not installed yet as I just fitted the boxes in place.
.jpg)
Just aft of the new base cabinet is the opening for the compact LG washer/dryer combo unit. Out of all the units I looked at on line, the LG units have the best, most consistent reviews. Im a little leery of its ability to dry clothes with only 120 volts, so I have it in the back of my head that a decent working clothes line might be in order... probably something on the roof running off of the mast. The large opening starboard of the instrument dash area is where the electrical distribution panel is going to go. I had some sort of cut twice/measure once thing going on and screwed up the door that houses the electric panel. I found out this mistake today as I was fitting all the shiny parts Ive made in the last week.
I have the wheel house counter top fabricated and dry fitted in place, but not not yet installed. Before the top gets installed, I need to land all the wires on the bulkhead behind the distribution panel door. I used THHN for the primary wiring behind the walls, and will land all that on terminal strips. From the terminal strips, to the distribution panel, Im using a flexible, tinned, marine wire. I have about 90% of the boat wire pulled to the area under the dash, and landing it with the top off is going to be huge vs lying on my back. I realize Ill still be doing some wiring while laying down, but I want to get as much done while its relatively accessible.
.jpg)
While I was fabricating in the barn last week, I decided to make the panel that finishes covering the dry exhaust/intake stack. Because the stack is such a large fixture, I decided to make this panel a raised panel. A large, flat piece of plywood just didnt feel right. The cherry veneer plywood is for sure nice material, but in my opinion, is a little too perfect. The air dried cherry I am using oozes character, and really puts the plywood to shame in regard to interest. Being in the center of the room and such a visual element, this large raised panel looks spot on.
Heres to the coming Spring.
Cheers

This is a fairly straight forward door, but like all things engineered by the seat of ones pants, I have to build a little forgiveness into my designs. The biggest guess I had to make was how much of a gap to leave between the door stops and the door to accommodate a sealing gasket.
For this purpose, I made the hardwood stops easy to be removed by installing threaded inserts into the door. The threaded inserts are installed by drilling a proper sized hole, then using a special tool to crimp the insert into the hole in the aluminum.
This is almost identical to a rivet, but is extremely robust. I bedded the hardwood stops in silicone and used a 10-24 x 1.5" stainless pan head screw to fasten the stops. The screws are 12" on center. The other alternative to fasten the stops to the jamb would have been to through bolt the stops in place, but if one ever have to remove a stop later down the road, the casings would also have to be removed to access the nuts. Through bolting is also kind of sloppy in my opinion and alignment seems to be a fuzz more difficult when through bolting.
Because I did not want to see the edge of the plywood I turned to my tried and true method of ironing hardwood veneer. Ive been using this iron on edge banding for years now, and have never had any issue with the adhesive failing.
Once you iron the edge on, you trim it off with a special tool that cuts both sides flush in one pass. A light sanding with 220 is all thats needed to make the edge perfect. I love the edge banding system. 

.jpg)
Most every time I show up to work on the boat, I have a small armload of parts or material hauled from the storehouse in the barn. Sunday, before I applied the last coat of urethane on the counter top, I took a couple of hours to clean and re organize some space. Just about every cabin is overflowing with material, parts and tools. But since the salon is the next and last really big wood working project, I had to make room in there. Still to be completed in the salon before the room can be sheathed is to run water lines for the fresh water flush toilet and associated sink along with turning the three 1 1/2" waste lines down in to the lazarette. A few wires need to be pulled along with deciding on where to mount the stereo, but no real big work has to be completed before sheathing can begin..jpg)

The first decision I had to make on the wheel house door build was how to build the frame. I found a piece of 2 x 6 x 1/4 " angle at the scrap yard and ripped the six inch side to 4" to match my 4" wheel house frame depth. The angles on the rough opening are a degree off of 90, so a little fitting had to be done before I could tack the frame together. I guess at this point I should say that I TIG welded the wheel house door. The frame was assembled using miters, with all the cuts being made with my miter saw... you gotta love Aluminum. Once the frame was fit in to the opening, I built the actual door frame using some 1" x 2" angle and some 2" flat bar for internal framing.
I had the hinges in the shop, so figuring out the reveal of the door was not too big of a deal.
With hindsight being 20/20, I wish I had used a hinge that did not require a mortise. I ended up having to create a mortise for the hinge in the door, and while not a deal killer for the success of the job, it was sort of a pain.
On As per advice from my paint vendor, I conditioned the aluminum with some material I applied with a spray bottle. The conditioner had to sit on the metal for 15 or 20 minutes, then I hosed the metal clean and let it drip dry. My paint guy said the conditioner is good for 24 for hours, so after baking in the sun for a few hours, I hung the door from some lines and gave it two coats of epoxy primer along with the frame. After priming the door, I faired the ground edge of the door first using West epoxy mixed with fairing compound, then finished with Rage filler sanded to 320 grit. Spot painting two coats of primer on the filler to seal it, then three or four coats of acrylic urethane top coat and the door was ready for assembly. 


.jpg)
.jpg)
The window stool extends past the plywood by 3/4", and will receive a 1/2" bonnet under the stool to trim out the underside of the stool. The window casings will be 1/2" thick and will cover the extension jamb/plywood joint while finishing the trim detail. All the reveals on the windows are a 1/4". I left the jambs off of the window clamp ring by 1/4", the stool will be proud of the bonnet and casings by 1/4", and the casing edge will be 1/4" off the edge of the jamb. The window stool edge was rounded over using a 3/8 round over bit in the router, and all the other edges will be eased by hand sanding.
I used screws to hold down the stools, and all the other parts, jambs, casings, and bonnets are fastened by the nail gun using galvanized finish nails.
The wheel house windows lean out at 7 degrees, but the wall under the widows is plumb as she will sit on her water line. This part of the wheel house wall, the aft salon wall, and the water tight bulkhead on station # 9 are the only plumb walls on board. I created this chase so I could fit hose for a window defroster system and also to house windshield wiper motors.
When its all said and done, the console top will die into the angled companion way top, and a cabinet will be fitted above that as to not interfere or requiring notching the trim of the small window in that corner. 