Along with no ice on the boat roof, and a break in the weather, I decided to install the mast. Unlike most things boat building, this particular phase of the project actually went fairly smooth and took about as long as I figured. Getting all the parts and gear loaded on the truck took as much time as the actual installation.
.jpg)
I dont know what the mast weighs, but Id have to guess around 150 lbs. Getting it up on top of the boat was a simple matter of leaning it against the boat above the swim platform and with me on top, and with my helper lifting from the bottom, we quickly had it on the roof.
The layout work for the pins and bushings was spot on, so it was a simple matter of first installing the upper pins and bushings, heavily tack welding the bushings ( with the pins in place ), standing the mast up, then heavily tack welding the lower bushings in place. Once everything was tacked in place and I verified the pins were not in a bind, it was final welded with a stick machine. .jpg)
If push comes to shove, a stout person probably could step the mast by himself. Once the mast is standing, its just a matter of getting the fore and aft thing just right so the bottom locking pin can be pushed home. I should probably turn a pin with a heavy chamfer on it so its self aligning and can easily be driven home while one person both holds the mast up and drives the pin home. For the sake of safety, its a two person job, but like I said, if push comes to shove, one person probably could handle it.
.jpg)
Having never really been on a boat with a mast before, once we had it welded and standing in place, it seemed ginourmous. I know 20 isnt squat when talking about sailboats and mast, but standing on my roof while looking up at the mast, it seemed to be way up there. With the mast standing unstayed, and me pushing on it, there was a little flex in the framing. The turnbuckles I used were capable of taking up 6". Pulling the cables as tight as we could by hand, then swagging the thimbles to the turnbuckle eyes left what appeared to be a decent sag in the cable. Once we had the three stay cables rigged, I was impressed by how little it took to tighten them up. I should have probably measured, but I dont think we took up more than 1 1/2" before the cables were as tight as I thought they needed to be. Id like to hear from one who knows about how tight these cables need to be, but to me they feel pretty comfy. The two shroud cables are about five degrees off of 90 degrees to the mast, so the fore stay cable pulls against the shroud cables. Shrouds are athwart-ship while stays are fore and aft. With the cables tensioned, the mast now felt rock solid.
.jpg)
Having spent the last three weeks fabricating in the shop and dry fitting everything together, getting the boom in place and rigging the electric winches took practically no time at all. Using a spare battery from the shop to temporarily electrify the winches, we were finally making things go up and down. We played around for a short time and hoisted the 200 lbs generator to the roof and back down. The winches are remote controlled, and have different frequencies, so thats going to make things easier.
.jpg)
To wrap up this project, I need to build a dedicated battery box and decide how Im going to charge the battery. All the solenoids, and fuses for the winches will go in the battery box. Ill probably build the box big enough to hold some tools slings for lifting. Im leaning towards a dedicated winch battery vs pulling heavy wires from the main distribution panel.
A wire chase is already framed from the wheel house to the mast step, so getting wires to that point will be easy. I have a 6x6 splice box already on the mast step, and this will be my transition from interior to exterior. Ill make water tight connections in the splice box and bring cord out of the splice box using cord grips. I dont think Ill be able to do this with the radar cord, so a custom split cord grip will have to be used.
%2B-%2BCopy%2B(2).jpg)
The heavy work is finished on this project and Im pretty happy with how its turned out. Im going to finalize fabricating the wiring harnesss for the winches and getting a battery box built so I can use the hoist for the hand rail build. most of the hand rail will be fabricated and welded in the shop so Ill use the boom to hoist the three sections along with holding them in place while I weld the rail to the roof. It will also be nice being able to hoist the welder to the roof. Heck I might even bring the big MIG welder down to do this job now that I can get it along with the large tank up top.
Im liking this project.
Cheers



After the first window went in, we had to make a decision on how to deal with the squeeze out of the black sealant. I started to tool the joint, and attempt to wipe things clean, but I soon found things getting out of hand. The sealant was on my hands, and clothes along with getting on the powder coated window, and finding its way to the boat quite a distance away from the window.
The stuff seemed to jump! So after getting that mess cleaned up, we decided it was going to be best to deal with the squeeze out once the material cured. I messed around with it a bit the other day and to my pleasant surprise, it does pull away from the paint ( with some effort ) at the paint/ window flange joint. A hard plastic tool or plastic scraper will be needed to coax the material off of the boat. 


ubic footage and measuring with the five gallon bucket gave me about the same volume of water within two gallons, so Ill stick with measuring for cubic footage vs filling each tank to get volume. I have 325 + gallons worth of water tanks.
oat. Where the bracket is deeper in the hull ( by the center line of the boat), I used studs welded to the hull bracket that the tank flange will drop over. On the less deep end of the tank ( outboard ends), I used nuts welded to the hull brackets that the tank flange will bolt to. I used 30 mill pvc pond liner I had laying around the shop to act as a gasket to go between each tank flange and hull bracket.