Sometimes during the build when I would abruptly run head first into the learning curve, I would get a little discourage, feeling like I was doing two steps back for each step forward. Right now, I feel like good progress is being made and things are headed in a good direction.
I chipped out all the burnt foam and prepped and primed the metal where the paint was burned off from welding on the super structure. This was a pretty tame job, which did not take much time and had me more convinced how easy foam is to deal with.

With all the metal now primed, I spent a morning patching in the framing and cleaning the boat to be ready for the foam crew. Once the foam job was ordered, we waited about a week for them to show up, and watched them blow through our job in about an hour.
The last big welding job on board is to weld the exhaust stack between the salon deck and the roof. I had to buy a sheet of 1/8", and some angle to build two access panels. I was tempted to not sand blast this last welding job, but Ive blasted every piece of metal in this boat and theres no reason to start doing things wrong now. All the chimney parts are cut, fabricated, blasted and primed, waiting for me to weld them in the chimney. Ill post a blog on that job after I get it finished this weekend.
All the lumber to finish the ceilings is sitting in the barn ready to get primed. 4" bead board will be used for the master cabin and dressing room. 6" V groove will be used for the salon and wheel house. The ceilings will go in before the wall material. The ceilings will get painted.

When I started on this build I did a lot of reading on what trawler is, and what makes a trawler a go anywhere type boat. Naval architects use ratios to qualify their work, and one of the important ratios for me was the displacement to length ratio or the D/L. This ratio tells one what the heft of the boat is. How much fuel you can carry, how much water, food, parts, tools, toys, etc... can be put safely on board. For me having a go anywhere boat meant having a relatively heavy D/L. The D/L ratio has sort of been relegated to my brains back burner until the boat yard put a 38 Marine Trader next to me. True, Im a 44 boat vs the 38 Marine Trader, but the difference in the D/L between the two vessels is stark.

This time next week, I should be full blown back in to wood working. Winter is sneaking up on us, and Im looking forward to how easy it will be to keep the boat warm, and the sweet smells of the freshly milled Cherry lumber.
Cheers
Read More..
I chipped out all the burnt foam and prepped and primed the metal where the paint was burned off from welding on the super structure. This was a pretty tame job, which did not take much time and had me more convinced how easy foam is to deal with.

With all the metal now primed, I spent a morning patching in the framing and cleaning the boat to be ready for the foam crew. Once the foam job was ordered, we waited about a week for them to show up, and watched them blow through our job in about an hour.

The last big welding job on board is to weld the exhaust stack between the salon deck and the roof. I had to buy a sheet of 1/8", and some angle to build two access panels. I was tempted to not sand blast this last welding job, but Ive blasted every piece of metal in this boat and theres no reason to start doing things wrong now. All the chimney parts are cut, fabricated, blasted and primed, waiting for me to weld them in the chimney. Ill post a blog on that job after I get it finished this weekend.

All the lumber to finish the ceilings is sitting in the barn ready to get primed. 4" bead board will be used for the master cabin and dressing room. 6" V groove will be used for the salon and wheel house. The ceilings will go in before the wall material. The ceilings will get painted.


When I started on this build I did a lot of reading on what trawler is, and what makes a trawler a go anywhere type boat. Naval architects use ratios to qualify their work, and one of the important ratios for me was the displacement to length ratio or the D/L. This ratio tells one what the heft of the boat is. How much fuel you can carry, how much water, food, parts, tools, toys, etc... can be put safely on board. For me having a go anywhere boat meant having a relatively heavy D/L. The D/L ratio has sort of been relegated to my brains back burner until the boat yard put a 38 Marine Trader next to me. True, Im a 44 boat vs the 38 Marine Trader, but the difference in the D/L between the two vessels is stark.

This time next week, I should be full blown back in to wood working. Winter is sneaking up on us, and Im looking forward to how easy it will be to keep the boat warm, and the sweet smells of the freshly milled Cherry lumber.
Cheers

uare footage on the floor since Ive raised the floor profile and allowed the plywood to "slide" more outboard against the frames. Its amazing how much more room I have since the sole grew outboard when I mocked up the sole framing system. Screwing the plywood directly to the steel in my opinion will make lifting pieces of the floor a real pain in the ass years down the road as screws rust and break. Ill end up with about 6 2" of headroom once the finished ceiling is installed. This 6 2" seems to be my minimum as some areas will be a little more ( 6 7" in some areas). Im 5 11" tall and Im totally happy with the headroom I"ll end up with.
he screw getting loose on the lumber, and a squeak developing. It if for all the reasons I just listed that I think the adhesive will give me some a little better job.
ing without having to remove any partitions. For this reason Ill have to frame the cabin sole in a way that allows the sole to be supported from below while the partitions remain in place. I also have to frame in all my access panels in the floor for access to water tank valves and whatever else I need to maintain below the floor. In a nut shell the cabin sole is basically made up of lots of small pieces that fit together to make the sole system.
various cabin partitions and cabin components. Once I new where most everything will go regarding living space, I will put layout lines down on the sole and alter the sole to accept the framing above. Doing it this way allows me days to ponder locations and do mock ups to see how things fit. Now is the time I start fighting for every square inch so I want to make sure it works for me and works for the boat. Most of the decisions Im making have me giving most of my consideration to how easy things will be to service and maintain.
teps from above one will stop at a landing. By turning left you will pass through a door and enter the master cabin witch measures 11 x 11. There will be a full size queen bed with drawers underneath, a sink/vanity on the right side along with vanity/dresser for Shannon also on the right side. On the left side will be a desk for me and a locker to hang things in. Bookcases and shelves will make up the wall above the bed, and a flat screen TV on the wall opposite the bed. A watertight door leads to the engine room on the left side of the bed and another door leads to the common shower/head on the right side of the bed.
is a port light in the bathroom, and two port lights in the master cabin. All the ports are fixed and cannot be opened. Ill post more on ventilation later down the road, but in a nutshell I have a hatch in the "V", and two six inch vents for the master cabin leading up through the wheel house. The bathroom has force ventilation leading up to the Portuguese bridge. The lower forward area will also have its own dedicated air conditioning system.
my boxes for my 12v and 120v fixtures. Once I know where all my various light fixtures and appliances go, Ill run conduit and boxes similar to conventional house wiring only Ill use stranded wiring instead of the solid wire one would see in a house. I also will run as much of my waste and water lines along with anything else I feel comfortable having buried in the foam. Ive been using urethane adhesive to glue nailer blocks to certain parts of the hull on the recommendation of the insulator. He told me to go ahead and use only adhesive, because once he sprays that particular block into the foam, Ill not be able to get it out and that block will become part of the insulation. Because of the ease of just slapping some glue on a wood block and sticking it to the hull Im putting up blocks any place I remotely think I"ll need one.