Guest cabin dressing room





The basic layout of the cabin area below is as follows: Down four steps from the salon above. Once at the bottom of the steps, you can either turn left through a door and get to the master cabin, or go straight through another door to get to the guest cabin dressing room/hallway. One has to go through this area to get to the guest cabin/kids cabin located in the forward area of the hull. Each cabin has a door to access the common bathroom where the shower and toilet is located. Each cabin ( master and guest) has its own sink. The engine room is accessed from the master cabin through a water tight steel door.

Standing in the guest cabin dressing room, one will find a large sink base with storage underneath, four wall mounted cabinets, and a bench seat with storage underneath it. There will be two ceiling mounted DC lights, and one ceiling mounted AC light with all lights being controlled by switches on the wall. There is also a decent amount of wall space available to have some hanging storage without impacting ones ability to walk through the space.

Because of my wish filled thinking regarding shower sump pumps, I had to re think how I was going to hold the gray water from the shower and cabin sinks. I decided to add a holding tank, and the most logical place for it was under one of the bunks against the dressing room bulkhead. I was going to buy a plastic tank, but since I had enough stainless plate left over from the water tank construction I decided to fabricate my own and save some cash. The tank ended up with 47 gallons of capacity.


Under the sink base in the dressing room is some of the gray water plumbing. The through hull fitting you see is above the water line. When we have to hold our gray water, the blue valve will be shut and the black valve will be open. This will direct the water to the main sump which will then direct the water to the 47 gallon holding tank I just built. When we can discharge gray water, the blue valve will be open, the black valve will be closed, and the shower sump will discharge overboard via the black pipe when the sump selector valve is in that mode. Its a pretty simple set up albeit a bit on the bulky side, but I made everything from parts found in the shop and did not have to depart with any cash. The elbow on he end of the manifold is for the guest cabin dressing room sink once I get that sink installed.

I built four more cabinets to fill up the wall in this room, and stopped them well short of the port light. One of the cabinets will be the medicine cabinet above the sink, while the other three will be general storage. The cabinets are 12 inches deep at the base, and about 18" deep at the top. Im also using these cabinets as the chase for the air conditioning duct that will feed the guest/kids cabin. That duct will be a four inch flexible pipe.

In order to give one as much privacy as possible, there will be a door between the dressing room and the bunk room. The door will be 20" wide.

I had enough room to create a bench in the dressing room so people could sit down while they were getting dressed. I installed a piano hinge on the lid of the bench so the bench could double as a locker for more storage.

The room is a fuzz narrow, but Im able to easily navigate through it without bumping my knees or having to turn the least bit sideways. I think this space will be an important part of the boat in regard to helping all on board with privacy, and a sense of having ones own space. To be honest, this is a very comfortable room even though its function is mostly utilitarian.

I have six doors to build for this room, and one more sheet of plywood to install on the partition between the master cabin and this space. I also have to plug all the screw holes, sand everything, and get a coat or two of finish on the wood. Once those jobs are finished, Im ready to start work on the sleeping room and its four bunks. Once the doors are installed and some finish on the wood, Ill post some more pics.
Read More..

Jumat, 11 Maret 2016

Guest cabin dressing room update


The six cabinet doors are finished and I have two coats of Urethane on all the wood in the guest cabin dressing room. I also have the sink base top completed, but its not installed yet as I changed my mind on the sink. I had purchased a square stainless steel sink for this room, but because the top is an odd shape, I could not get the sink installed in such a way that it looked aesthetically pleasing. A square sink on a trapezoid top just doesnt look right, so I decided to sell the square sink, and buy a round sink. Im still waiting on the round sink to arrive, then Ill finish the sink base install.

I had enough 1/4" Cherry plywood to use for the doors, so I decide to use a flat panel vs a raised panel for these six doors. I used the same style and rail method of door building as the master cabin. Using the flat panels shaved quite a few hours off of the door construction while helping preserve my stock of air dried lumber.

This room, along with the master cabin, are as finished as they are going to get for right now. Once Ive got the boat at the launch site, Ill give all the wood one more coat of Urethane. Ive still got quite a bit of work to do and it makes no sense to me to spend my time putting any more urethane on the wood as its going to get banged up. Theres enough protection on everything to get it through the rest of the build.

Im going to start on the kids cabins sometime next week. Im feeling confident that Ill get all the cabin wood work finished this Spring.
Read More..

Rabu, 02 Maret 2016

Guest cabin dressing room update 2



The last few weeks have found me getting the Carver boat ready for its new owner so not much has been getting done on the boat build. Now that the carver is finished and out of the shop, Im back working on the boat build.

I received the new sink so I was able to complete the installation of the top, the sink, and the faucet. All the cabin plumbing connections are now complete. If I had the pressure pump and a couple of days work, Id be able to use the sinks.

I installed a new valve for the through hull fitting under the guest cabin sink. The valve I had originally installed was a cheap gate valve that was probably doomed for failure. I installed a more corrosion resistant ball valve in place of the gate valve and hopefully saved myself a future headache. I had read on another forum that gate valves have no place on boats, and I agree.

The through hull fitting under this sink is the only through hull fitting for the cabins sinks and shower. This through hull fitting is a stainless steel piece of pipe, welded in to the hull that is threaded on the inboard end. The ball valve threads on to the pipe, and that is my basic through hull fitting. If gray water needs to be held, the red handled ball valve is shut, the black handled ball valve is opened, and the sump pump selector valve is moved to the holding tank position, then all the gray water goes to the holding tank. If we can discharge gray water, the red handled ball valve is opened, the black handled ball valve is closed, and the sump selector valve is moved to the discharge position so all gray water is either pumped or gravity flow overboard.

The galley sink, the clothes washing machine, and the half bath above will have another holding tank and one through hull fitting to deal with that gray water.