The foam is all trimmed, but the window openings still need some work. The work required by the openings is as much about the finished look as it is still prepping the rough openings. The rough opening in the metal is correct, but I still need to finish the opening so that the clamp ring for the window has something to grab against. Typically, windows can either be bolted to a metal hull, or the style I have which utilizes a clamp ring to attach the window.
The wall thickness required for the windows is different than the wall thickness created by the frames on the design. The two wall thicknesss add some work, and design challenge regarding how the finish work will look. Fitting the clamp ring surface now vs at the launch site will shave mega hours off of this job and keep frustration at bay.
Because I have radius windows, I had to make these frame with a radius inside corners. To make things easier, I cut the whole radius on the style pieces ( vertical piece). I made the style wide enough to accept a cleat later so I can trim the finish wall material neat to the clamp ring. I dont need a cleat along the rail as the window will have some sort of sill on the bottom, and wall material on the header will have plenty to screw to above the window. Once I figured out the width of the style, I made a pattern, then transferred that to my work and cut it on the band saw.
I used Cherry plywood to build the frames, so if I want to stop at this layer of finish work, the clamp ring/frame joint will look good. I think I might add another piece to the finish work regarding window trim, so the cherry might get buried. Either way, I have it beat now. As soon as I finish the wheel house frames, Ill go ahead and put three coats of Urethane on the frames, and then theyll be ready for the final install of the windows once we get to the launch site. Theres three or four days worth of work ( in the warm shop ) prepping the openings to accept the windows, but once I have it completed, it should only take two of us a couple of hours to get all the windows installed once I land the super structure to the hull. Its important to me to be able to quickly have the boat weather tight once she leaves the barn.
Temperatures are going to drop in to the teens tonight, so I have the wood boiler running hard and the radiant floor heat has the shop floor up to about 90 degrees. The rest of the building is about 65 degrees and all is good in Conall-ville.